AI Data Center Consulting · Gulf Priority

Build your AI data center
right from day one.

Most GPU facilities underperform from the moment they go live. Architecture decisions made in week one determine whether you run at 20% or 80%+ MFU for the next five years. NYDUX fixes this before you deploy.

Book a free 20-min call See the $5K diagnostic →
80%+
Target MFU from day one
$15K–$25K
Fixed price assessment
2 weeks
Full report + workshop
$480K+
Annual savings per cluster
What's included

Six deliverables.
Two weeks. Fixed price.

Every DC Readiness Assessment covers the six failure points we see in every new GPU facility — before you spend $100M on hardware that runs at 20%.

01
Site & Power Architecture Review
Power density planning, cooling architecture, rack layout for GPU interconnect efficiency. Validated against 128+ GPU cluster benchmarks.
02
GPU Interconnect Fabric Selection
InfiniBand vs RoCEv2 decision framework based on your workload. NCCL topology alignment. Switch vendor matrix with vendor-neutral recommendations.
03
Compliance Framework
Saudi PDPL + NCA cloud framework. UAE data residency requirements. ICV programme alignment. Built into architecture from day one.
04
Pre-Deployment MFU Checklist
47-point checklist covering NCCL environment variables, MTU settings, topology files, buffer sizes — everything that determines MFU on day one.
05
Vendor Selection Matrix
GPU procurement advisory. NVIDIA, AMD, InfiniBand, RoCE vendor comparison. No OEM pull-through. Recommendations based on your workload profile only.
06
Half-Day On-Site Workshop
Live walkthrough with your engineering team. Q&A on architecture decisions. Handoff of implementation roadmap. Virtual or on-site (Gulf travel included).
How it works

Four steps.
Two weeks.

No retainer required to start. Fixed price. Clear deliverables. You own everything.

01
Intake call
20-min call to understand facility scope, GPU count, workload type, compliance requirements, and timeline.
02
Architecture review
5-day deep dive into your current plans. We review network diagrams, power specs, vendor shortlists, and compliance requirements.
03
Report delivery
Full readiness report with gap analysis, vendor matrix, compliance checklist, and 90-day implementation roadmap. Day 10.
04
Workshop
Half-day session with your team. Walk through findings, answer questions, align on implementation priorities. Day 14.
Why this matters

The cost of getting
architecture wrong.

Architecture decisions in week one determine cluster performance for years. The difference between a well-designed and poorly-designed GPU facility is not hardware — it's configuration.

Without assessment
NCCL ring misaligned with rack topology
MTU boundary fragmentation at 64KB
Wrong interconnect fabric for workload
Compliance issues discovered post-deployment
7–20% MFU on $100M+ hardware
$300K–$600K wasted annually per cluster
With NYDUX assessment
NCCL topology aligned before first training run
MTU configured correctly at deployment
Interconnect fabric matched to workload
PDPL / NCA / UAE compliance built in from day one
80%+ MFU from day one
$480K+ annual compute savings recovered

Ready to build your AI
data center right?

Book a free 20-minute call. We'll map your facility plan to the NYDUX readiness framework and identify where the biggest risks and savings are.

احجز مكالمة مجانية — نقيّم جاهزية مركز بياناتك قبل النشر
Or start with the $5K GPU diagnostic · Benchmarks at GitHub